Our servers installation in Equinix NY4 Data Center has been completed in September 2017.
Below pictures showing our simple tidy installation. What looks good will work well.
Ultra low latency routers connected to the patch panel with single mode fiber optic cables (yellow cables):
First 10 servers installed (photo from the front).
The unconventional 1,5 U height with 60mm fans is the most efficient cooling/occupied space solution:
No obstacle in the way of airflow ensures perfect cooling which permits our HFT servers run on a maximum CPU clock frequency.
Servers from the back:
Written by: Nandor Herpai